introduces in the Philippines a
Waste-To-Energy (WTE)
Pyrolysis / Gasification
Technology
Modular Catalytic gasification waste parocessing plants,
from 50 tons to 500 tons per day capacity, Clean-tech,
water-free processing system
that eliminates the need for additional dumpsites/landfills
Water Processing Plant
(WPP)
12 to 18 months in initial operational phase
Initial installation of 50 T/day, completion to
be scheduled
Chemical and Laboratory on-site
Emission-free
Fully compliant with EU Standards on
Emission limits
Advanced Thermal
Residual Waste Treatment
Additional Segregation
(Automatic and/or Manual)
PYROLYSIS of Remaining Waste after Segregation:
Preparation of the waste feedstock
Processing the waste
Purifying the gas
Cooling gas into petroleum products